Testing
Procurement of Raw Material
Forgings, Pipes, Tubes, Plates etc are checked dimensionally and manufacturer's T.C. is also verified with Heat Marks. Non-Destructive testing like Eddy Current, Ultrasonic Testing, D P Check is carried out at the vendor's place. In absence of such certificate, sample piece of material is sent to Govt. Approved Laboratory for physical test & chemical analysis. The results are verified with applicable specifications after which the material is accepted and used for further processing. In case of third party inspection, the identification & testing is witnessed by 3rd Party Inspection Agencies.
Check of Processed Components
Each & every components after processing like Cutting, Forming, Drilling, Reaming, Turning, Grooving, etc is checked dimensionally vis a vis the specified dimensions in the drawing. All the readings are noted and recorded. We have complete range of precision measuring instruments for carrying out dimensional checks such as
  Micrometers (Range upto 300 m.m.)
  Vernier Calipers (Range upto 1000 m.m)
  Inside Dial Calipers for measuring Grooves & Bores (Range 10-35 m.m)
  Dial Bore Gauge (Range 10 to 150 m.m.) and many more gauges.
Assembly Set up & Welding
After assembly of the components is done, dimensional check is carried out vis a vis the required dimensions, after keeping the necessary allowances for welding strectching/shrinkages. Necessary WPS & PQR are in place and welding is carried out using the electrodes as specified after being preheated in oven.
Post Welding Stage
After carrying out the welding, visual check and Dye Penetrate check is carried out by us. Radiography is carried out by competent agencies hired by us.
Cases where Post-Weld Heat Treatment is required, the material is sent to outside agency for carrying out Heat Treatment.
Final Dimensional & Visual Check
Entire Equipment is checked visually for any weld splatters, surface finishing etc. The equipment is checked dimensionally to confirm that all the dimensions within the allowable tolerances of the applicable code.
Final Hydro-test
Final Hydro-test is carried out, after all the above stages are cleared. For carrying out the hydro-test we have
  Hydraulic Test Pumps (2 Nos) - Pressure upto 150 Kgs/Cm2
  Pressure Gauges upto 150 Kgs/Cm2
All the Pressure Gauges are calibrated before every Hydro test in presence of the third party inspector.
Acid Cleaning/Painting is carried out after, the equipment has been cleared by the client's inspection wing/third party inspector.
Documentation
Heat Chart, alongwith material test certificates, Release Note & Internal Inspection Report alongwith the Hydro-test and Guarantee Certificate are prepared for the every equipment.